WBE Star 2024 Winner
Learn More ->
<-Back to projects

DTE Willow Gate Station

  • Energy
  • Process Piping Fabrication & Delivery

Project Description

DTE was required to take down 3-30” natural gas lines that served the surrounding communities. Reagan Mechnical coordinated and delivered piping to four new gas heaters and associated pipeline shut-off valves. WGS is DTE’s largest Gate Station servicing Southeastern Michigan.

Schedule:

  • 10 Months.

Project Challenges

Pipe fabrication was scheduled with the installing contractor who worked 24/7 to make critical tie-ins. The provided measurements from the field changed several times as a result of unanticipated field conditions, which required last minute design changes that were only successful because of clear and constant coordinating with the field contractor.

Project Solutions

Provide CAD services, pipe Spooling, detailing, API 1104 pipe fabrication, OQ Services, pipe fabrication.

Total Project Value

$450,000.00