WBE Star 2024 Winner
Learn More ->
<-Back to projects

Vinton Building

  • Residential
  • Mechanical, Plumbing, HVAC, & Controls

Project Description

11 Story Luxury Apartments and retail Space. New mechanical room equipment, State of the art temperature controls system, warm board floor heating system. High-end plumbing fixtures throughout.

Schedule:

  • 2017-2018 14 months.

Project Challenges

Sharing space with other contractors during renovation of a high rise building. Working in a busy downtown area on a major intersection. Understanding how to work with an out of town General contractor who wasn’t familiar with the Detroit area.

Project Solutions

Reagan Mechanical pre-fabricated duct work and piping before delivery to the job site. After hours and weekends work was required to fabricate, deliver, and stage materials on each floor to avoid congestion.

Reagan Mechnical advised the client on value engineering related to the floor heating system. Reagan Mechanical's constructable solutions helped build trust and were delivered in manor that maintained a positive working relationship.

Total Project Value

$3,600,000.00